NTPC has increased thrust on hydro development for a balanced portfolio for long term sustainability. The first step in this direction was taken by initiating investment in Koldam Hydro Electric Power Project located on Satluj river in Bilaspur district of Himachal Pradesh. Other hydro project under construction are Tapovan Vishnugad, Lata Tapovan, Rammam III, THDC-Vishnugad Pipalkoti, THDC-Tehri PSP and NEEPCO-Kameng.
NTPC Owned
Sr. No. | STATION | STATE | CAPACITY (MW) |
---|---|---|---|
1. | Koldam (HEPP) | Himachal Pradesh | 800 |
Total | 800 |
Joint Ventures/ Subsidiaries
Sr. No. | STATION | STATE | CAPACITY (MW) |
---|---|---|---|
1. | Doyang HEP(3 X 25) (NEEPCO) | Nagaland | 75 |
2. | Kameng HEP(4 X 150) (NEEPCO) | Arunachal | 600 |
3. | Kopili HEP(200+50+25) (NEEPCO) | Assam | 275 |
4. | Koteshwar HPP (THDC) | Uttarakhand | 400 |
5. | Pare HEP(2 X 55) (NEEPCO) | Arunachal | 110 |
6. | Ranganadi HEP (3X135) (NEEPCO) | Arunachal | 405 |
7. | Tehri HPP (THDC) | Uttarakhand | 1000 |
8. | Tuirial HEP(2 X 30) (NEEPCO) | Mizoram | 60 |
Total | 2,925 |